Home security checklist

How to build a panic room in an existing house

Before fitting a panic room in an existing home, find out whether the project is feasible. Assess the room, structure, access, ventilation, communications and escape options before ordering equipment. The aim is a design that can be priced, with each contractor clear about their responsibilities.

Home-jacking.com editorial teamUpdated 4 November 20266 min readSources

Budgeting for a safe room in an existing house

In an existing house, the cost depends as much on what the room can be fixed to and how its parts fit together as it does on the door. A supplier’s package price is a starting point. Ask for an itemised quote covering alterations, electrical work, communications and finishes so that you know what you will have to pay for before work starts.

Choosing a room that suits its users

Consider who can reach the room, where they would be coming from, what openings it has and how much work it needs. A basement may be discreet but too far from the bedrooms. A closer room might need extensive changes to the walls or building services.

Start with the people who will use the space. When would they need to reach it? Does anyone have limited mobility? Use the answers to compare possible locations. Keep personal details and detailed floor plans in the private project file.

If you mainly need to protect the bedrooms and connecting corridors, consider a secure sleeping area. If you need a dedicated room, the guide to panic rooms can help you specify which functions you need before you consider suppliers’ claims.

Checking the existing structure

The original plans may no longer show the position or condition of partitions, supports or building services. Ask the designer to identify what is known, what needs measuring on site and what requires further investigation.

Bern University of Applied Sciences (BFH) describes how existing structures are assessed to identify damage and plan reinforcement work. Ask the designer to document the available supports, load limits and how the new work will meet the existing building. This can help prevent expensive surprises once work starts.

Choose a reinforced door or panel only when you know how its frame, fixings, walls and openings for cables or pipes will fit together. Forced-entry resistance classes describe the tested performance of particular components. Combining rated components does not give the finished room a rating of its own.

Planning ventilation, lighting and communications

Specify how many people might use the room, how long they might stay and any particular needs. Use that information to plan the equipment, including ventilation, even if you expect people to stay only briefly.

Check that the lighting and communications work with the door closed. A successful phone call from the doorway does not establish reception inside the completed room. Test the equipment you will actually use, with its intended power supplies and connections.

The guide to alarms during a power cut explains why backup power and a working connection are separate questions. Apply the same checks to the rest of the room’s equipment. Record which functions will still work under each failure scenario and for how long, where that duration can be substantiated.

Planning for fire, escape and emergency access

Reinforcing a room may change how people unlock the door and get out, and how emergency crews can get in. Resolve these points with the relevant professionals at the design stage. A forced-entry rating tells you nothing about resistance to fire or gunfire.

Escape and emergency access requirements depend on the building, the home and the work proposed. Have the project checked against the applicable local rules.

Agree who will check that the locking arrangements allow people to get out and emergency crews to get in. Establish which permissions you need from the owner, the co-owners or local authorities before components are made.

Agreeing who is responsible for each part of the work

A project may involve a designer, a physical security specialist, an electrician and building or fire safety specialists. Agree who checks that a cable run preserves the integrity of the enclosure, who tests the finished room and who puts a fault right when it falls between two contractors’ areas of work.

Put those responsibilities in writing. A quote that says “connection to be arranged” leaves the cost, time and responsibility unclear. Use the guide to comparing home security quotes to ask every contractor to price the same work.

Separate the costs of design work, building work, equipment and ongoing maintenance or operation. Check options and exclusions before choosing a package. A quote with attractive interior finishes might still leave out an essential function.

What should be included in the feasibility report?

On a small screen, scroll the table horizontally.

Part of the report What the report should help you decide
Household members and their needs Identify who needs the room, when and why.
Locations being compared Choose a room or rule out an unsuitable location.
Condition of the existing building Identify surveys, alterations and further investigations.
Functions and performance Distinguish what is required, what has been demonstrated and what is excluded.
Coordination and approvals Agree who will do the work and who must approve it.
Costing and timetable Distinguish design, building work, optional extras and maintenance.
Handover Agree the checks to carry out and documents to receive.

The assessment may show that a room is unsuitable or that another approach would meet your needs better. That can spare you the cost of starting work in the wrong place. A supplier’s illustrated brochure cannot establish what is feasible in your home.

Handover, testing and maintenance

At handover, check that everyone who needs the room can use it and operate the door. Test communications with the room complete, check backup power and collect the technical documents. Arrange alarm tests with the provider that receives the signal. Never trigger a real emergency response to demonstrate the system.

Keep the model numbers, manuals, evidence of performance, maintenance contacts and a list of any outstanding defects. Agree who will fix each defect and by when. A demonstration that the room works and a certificate of forced-entry resistance tell you different things.

Review how you use the space when the household changes or work alters the property. A good starting point is a home security assessment or a study tailored to your needs before ordering a room sold as a standard product.

Sources and references

These are the documents used in this guide.

  1. Bern University of Applied Sciences (BFH): assessing existing structures Technical reference for the product or configuration described.
  2. Swiss fire safety guidance (AEAI): escape and rescue routes Swiss guidance on keeping escape routes clear. Check the requirements for your building.